This paper describes a study of the feasibility of a full floating LNG chain (FPSO with liquefaction units, connecting arms with LNG carriers, FSRU with regaseification units) (14pp)
This study looked for a correlation factor between impact pressures in model tests and in actual ships and tried to verify that specific membrane configurations are free from sloshing problems. (16pp)